M26288 Order Tracking

Order Item:
85% BAUXITE 8-5  6.00 TONS
85% BAUXITE 5-3  15.00 TONS
85% BAUXITE 3-1  18.10 TONS
85% BAUXITE 1-0  10.20 TONS
ANDALUSITE 1-0  2.00 TONS
WHITE FUSED ALUMINA 100 MESH 9.91 TONS
MLA-68 CERAMIC ULTRAFINES D50≤ 20 µM  2.40 TONS
96% MICRO SILICA – 1.60 TONS
ACTIVE ALUMINA POWDER D50≤5µM 1.80 TONS
70% SINTERED MULLITE – 1.20 TONS
71% CALCIUM ALUMINA – 1.60 TONS
SODIUM SILICATE POWDER – 3.13 TONS
92% MICRO SILICA – 4.65 TONS
BORAX – 0.34 TONS
CCM-90 180 MESH 0.98 TONS
BONDING CLAY <0.088 0.44 TONS
725 HIGH ALUMINA CEMENT – 0.65 TONS
MGO·CAO·FE2O3 6-3  7.40 TONS
MGO·CAO·FE2O3 3-1  4.40 TONS
MGO·CAO·FE2O3 1-0  3.00 TONS
…

JUN.16,Micro Silica

JUN.16,Micro Silica  have been finished and passed inspection.

JUN.16,85% Bauxite

JUN.16,85% Bauxite  have been finished and passed inspection.

JUN.16,Active Alumina Powder

JUN.16,Active Alumina Powder  have been finished and passed inspection.

JUN.16, 70% Sintered Mullite

JUN.16, 70% Sintered Mullite  have been finished and passed inspection.

JUN.16,Bonding Clay 0.088

JUN.16,Bonding Clay 0.088  have been finished and passed inspection.

JUN.16,Sodium Silicate Powder

JUN.16,Sodium Silicate Powder  have been finished and passed inspection.

JUN.16,Borax

JUN.16,Borax  have been finished and passed inspection.

JUN.16,Andalusite 1-0

JUN.16,Andalusite 1-0  have been finished and passed inspection.

JUN.16,White Fused Alumina 100 Mesh

JUN.16,White Fused Alumina 100 Mesh have been finished and passed inspection.

JUN.16,71% Calcium Alumina

JUN.16,71% Calcium Alumina  have been finished and passed inspection.

JUN.16,725 High Alumina Cement

JUN.16,725 High Alumina Cement  have been finished and passed inspection.

JUN.16,Mgo·Cao·Fe₂O₃ 1-0

JUN.16,Mgo·Cao·Fe₂O₃ 1-0  have been finished and passed inspection.

JUN.16,Mgo·Cao·Fe₂O₃ 3-1

JUN.16,Mgo·Cao·Fe₂O₃ 3-1  have been finished and passed inspection.

JUN.16,Mgo·Cao·Fe₂O₃ 6-3

JUN.16,Mgo·Cao·Fe₂O₃ 6-3  have been finished and passed inspection.

JUN.16,CCM-90 180 Mesh

JUN.16,CCM-90 180 Mesh  have been finished and passed inspection.

TEST REPORT

TEST REPORT

TEST REPORT

TEST REPORT

JUN.22,LOADING CONTAINER

JUN.22, CONTAINER have been loaded.

JUN.22,LOADING CONTAINER

JUN.22, CONTAINER have been loaded.

JUN.22,LOADING CONTAINER

JUN.22, CONTAINER have been loaded.

JUN.23, SHIPMENT SCHEDULE

BL NO.:AMJ0298289
M/V:CMA CGM POINTE DU PITON 0XLC3S1NC
ETD:  JUN.28, 2026
ETA:  JUL.21, 2026
Scroll to Top