M24527 Order Tracking
Order Item:
SIC BRICKS SIC 90(S) AS DRAWING 1524 PCS
SIC BRICKS SIC 90(5S) AS DRAWING 300 PCS
SIC BRICKS SIC 90(8S) AS DRAWING 67 PCS
SIC BRICKS SIC 90(68S) AS DRAWING 16 PCS
SIC BRICKS SIC 90(70S) AS DRAWING 15 PCS
SIC BRICKS SIC 90( 118S) AS DRAWING 12 PCS
SIC BRICKS SIC 90( 119S) AS DRAWING 18 PCS
SIC BRICKS SIC 90( 121S) AS DRAWING 1 PCS
SIC BRICKS SIC 90( 125S) AS DRAWING 2 PCS
SIC BRICKS SIC 90( 122S) AS DRAWING 40 PCS
SIC BRICKS SIC 90( 123S) AS DRAWING 16 PCS
SIC BRICKS SIC 90( 124S) AS DRAWING 12 PCS
SIC BRICKS SIC 90( 127S) AS DRAWING 12 PCS
SIC BRICKS SIC 90( 131S) AS DRAWING 23 PCS
SIC BRICKS SIC 90( 138S) AS DRAWING 64 PCS
SIC BRICKS SIC 90( 190S) AS DRAWING 44 PCS
SIC BRICKS SIC 90( 192S) AS DRAWING 64 PCS
HIGH ALUMINA CASTABLE A56P 5 MTS
…
FEB 10,SIC BRICKS SIC 90(S) AS DRAWING
FEB 10,SIC BRICKS SIC 90(S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90(5S) AS DRAWING
FEB 10, SIC BRICKS SIC 90(5S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90(8S) AS DRAWING
FEB 10, SIC BRICKS SIC 90(8S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90(68S) AS DRAWING
FEB 10,SIC BRICKS SIC 90(68S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90(70S) AS DRAWING
FEB 10,SIC BRICKS SIC 90(70S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 118S) AS DRAWING
FEB 10, SIC BRICKS SIC 90( 118S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 119S) AS DRAWING 18 PCS
FEB 10,SIC BRICKS SIC 90( 119S) AS DRAWING 18 PCS have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 121S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 121S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 125S) AS DRAWING
FEB 10, SIC BRICKS SIC 90( 125S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 122S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 122S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 123S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 123S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 124S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 124S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 127S) AS DRAWING
FEB 10, SIC BRICKS SIC 90( 127S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 131S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 131S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 138S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 138S) AS DRAWING have been finished and passed inspection.
FEB 10,SIC BRICKS SIC 90( 190S) AS DRAWING
FEB 10,SIC BRICKS SIC 90( 190S) AS DRAWING have been finished and passed inspection.
FEB 10, SIC BRICKS SIC 90( 192S) AS DRAWING
FEB 10, SIC BRICKS SIC 90( 192S) AS DRAWING have been finished and passed inspection.
FEB 12,LOADING CONTAINER OOLU1859050
FEB 12,CONTAINER have been loaded.
FEB 16, SHIPMENT SCHEDULE
ETD: FEB 17 2025
ETA: FEB 26 2025